Release & DSP

Release Engine

A release plan that works backward from drop day.

What you walk away with

  • Dated rollout timeline counted back from release
  • Distribution and metadata checklist (ISRC, UPC, credits)
  • Editorial pitch plan
  • Drop-week daily checklist

What the agent asks you

  • Release title, type, and date
  • Distributor
  • Budget and promo assets you have

How it runs

  1. 1Set the timeline from release date
  2. 2Prep metadata and upload
  3. 3Pitch editorial in time
  4. 4Run drop week

Guardrails

  • Builds in distributor lead time and the 7-day editorial pitch window
  • Never invents facts about you — it asks.
  • Never collects or stores your SSN.

Inside the package

Own this skill and download it as a portable package — a SKILL.md plugin for Claude Code that also works as instructions in other AI tools.

Preview SKILL.md
---
name: "release-music-with-dsp"
version: "2.0.0"
title: "Release Engine"
description: "A release plan that works backward from drop day."
desk: "release"
category: "Release & DSP"
author: "Artispreneur / ROSTR Runtime"
license: "Personal & Commercial Use License for Artists"
execution_mode: "autonomous_with_review"
inputs:
  - "Release title, type, and date"
  - "Distributor"
  - "Budget and promo assets you have"
deliverables:
  - "Dated rollout timeline counted back from release"
  - "Distribution and metadata checklist (ISRC, UPC, credits)"
  - "Editorial pitch plan"
  - "Drop-week daily checklist"
tools:
  - "create_document"
guardrails:
  - "Builds in distributor lead time and the 7-day editorial pitch window"
compatibility:
  - "Artispreneur Artie Orchestrator"
  - "ROSTR Runtime v2"
  - "Claude Code & Claude Desktop (.claude/skills)"
  - "Cursor & Windsurf (.agents/skills)"
  - "OpenAI Agents & LangChain"
---

# Release Engine

Rollout plan plus a drop-week checklist that actually ships.

## System Overview
- **Desk Specialization:** `release`
- **Typical Runtime:** ~25 minutes
- **Execution Engine:** ROSTR Runtime / Artie Multi-Agent Ecosystem

## Verified Deliverables
- Dated rollout timeline counted back from release
- Distribution and metadata checklist (ISRC, UPC, credits)
- Editorial pitch plan
- Drop-week daily checklist

## Required Inputs
- Release title, type, and date
- Distributor
- Budget and promo assets you have

## Autonomous Playbook
Goal: a dated rollout that ships on time.
1. Ask title, single/EP/album, release date, distributor, budget, assets.
2. Timeline counted back: final masters + artwork, distributor upload (allow 2–4 weeks), pre-save, Spotify editorial pitch at least 7 days before release, content schedule, press/playlist outreach.
3. Metadata checklist: credits, ISRCs, UPC, explicit flag, lyrics, splits documented.
4. Drop-week checklist by day. Post-release: first 30 days.
5. Call create_document (type "rollout").

## Quality Guardrails & Security
- Builds in distributor lead time and the 7-day editorial pitch window
- Never invent facts about the artist (names, credits, numbers, links).
- Never collect, store, or output SSNs, EINs, or sensitive banking credentials in prompts.
- All split sheets, contracts, and filings require verified artist approval.

---
*Artispreneur Skill Specification · https://artispreneur.com/services/release-music-with-dsp · Art Means Business.*

More in Release & DSP

← All skills